3.8 CABLE ROUTING
Cables having length in excess must be routed inside the PVC conduit and not rolled up
along the frame. Also the cables inside the PWO must be routed in a neat way and not rolled
up.
3.9 GROUNDING
In order to avoid any problem with electrical noise that could effect the correct working of the
system make sure that:
The AC Power cable coming inside the PWO is always provided with a Ground and
connected to the proper connector (PE).
The station frame where the scanners, controllers, encoders, photocell are mounted must
also be grounded to the PE terminal inside the PWO.
The Shields of the Encoder and Photocell cables must be connected to the proper
electrical terminal (PE).
Long cables routed inside the
PVC conduit.
Long cables must not be rolled-up inside the PWO.